CMS LATEST NEWS
CMS have successfully completed a £2.5M project at Twickenham Rugby Stadium, working with Styles & Wood. The project was completed on time and within budget.
CMS appointed on two private school projects in the south of England, both on a design and build basis, total value 2.5Million.
CMS continues to work with Octagon, having been appointed on their latest prestigous residential project.
Octagon Developments
Project Title: Bishops Avenue
Main Contractor: Octagon Developments
Elect Consultant: Camron Taylor
Project Value: £800,000
Package: Electrical
Description: New Build
Programme: 14 Months
Description of works:
The installation electrical services to 27 new luxsury apartments, split into two blocks. Due to building control each required two separate incoming electrical supplies, this was achieved by the installation of 100kva Standby Generator set. The installation included Mains distribution, small power and lighting. The specialist works were carried out by others. The project was extremely complex to due to the high quality finishes required by our client.
Specialist Sub-Contractor Packages Included:
Stand-by generator system.